GENERAL PROVISIONSThe General Contractor shall provide a concrete slab, troweled smooth, flat level to a tolerance of 1/8" in a 10' radius. WORKING CONDITIONSThe flooring system shall note be delivered, stored or installed until all masonry, painting, plastering, tile and marble work are completed. All mechanical, electrical work shall be completed prior to installation of flooring. The room temperature shall be maintained permanently prior to installation, during and after completion of work at 65 to 75 degrees Fahrenheit and relative humidity to a range of 40% to 50%. After completion of work the owner/general contractor shall protect the flooring adequately. MATERIALS
INSTALLATION
FINISHINGAfter a smooth sanding, apply 3 coats of polyurethane or penetrating wood finish. NOTEPerimeter base is a must for FLOATING VERSION and has to be secured on the wall along the perimeter in such a way that the floor can expand and contract freely. MAINTENANCEUpon completion of floor installation, the owner or person in charge of the upkeep of the building are to see the areas in which wood floors are installed are adequately ventilated and natural or mechanical air circulation is provided at all times. GUARANTEE Any defects arising from faulty materials or workmanship will be corrected free of charge for a period of 2 YEARS. |
||||||||||||||
|
Array | Special Plank | Designer Series | Architectural Series | Borders | Crests & Medallions Home | Super Plank | Soundproof Hardwood Floors | Contact us
|
||||||||||||||
Montreal Parquetry Floors Inc |
||||||||||||||